Grain storage, processing and vessels loading at Varna West port

We offer our clients modern and reliable storage facilities for different types of grain. We process responsibly and with care the goods, ensuring the right temperature control and ventilation.

700 MT/hour

Our location and equipment allow us to load vessels with outstanding capacity of approximately 700 MT/hour.

Capacities

Our entry capacity goes up to 1 200 MT/hour thanks to our 2 separate lines of 600 MT/hour. The terminal is also equipped with a train unloading station also reaching a capacity of 600 MT/hour

We have invested in 2 alternative exit capacities, allowing us to effectively load vessels at Varna West Port, namely:

  • Air belt conveyor with a capacity of up to 1 500 MT/hour
  • By truck – up to 500 MT/hour

Above 100 000 MT

Varna West grain terminal has 10 separate silos, each of 12 500 m3, where, depending on product the storage capacity may reach above 100 000 MT.

Unique location

Varna West grain terminal is situated at the port of Varna West, being connected through an air belt conveyor of 1,4 km right with the pier. This unique asset is of benefit for our clients, minimizing their logistic costs while loading vessels at the port.

Loading is executed at berth 8 and/or 9, depending on the type and size of the ship, and the berths can accommodate vessels with a draft of up to 11,20 m and length of over 160 m.

Connected right with the pier

Connected through an air belt conveyor of 1,4 km right with the pier.

Modern equipment

Our entry capacity goes up to 1 200 MT/hour thanks to our 2 separate lines of 600 MT/hour. The terminal is also equipped with a train unloading station also reaching a capacity of 600 MT/hour …

Modern & reliable

We invest in modern and innovative storage facilities, ensuring minimal environmental impact.

Partnering together for success


inquiries@varnagrain.bg
t. +359 519 97 700